Edmonton & area / Railing renovation
Installed & finished in one day.
Built, stained and finished offsite, then fitted in your home in a single day. Less mess, more style. No dust, no fumes, just results.
Renovations do not have to take over your home.
- Dust and fumes through the house
- Contractors in and out for days
- Mess where your family lives
Ben keeps the messy work out of your home.
- Built offsite
- Stained and finished offsite
- Quick, clean installation
- One carpenter for all of it
Fresh railings, none of the hassle.
- Less stress and less mess
- A high-quality, professional finish
- Safe, solid railings that meet code
Before & After












The Process
The building, staining and finishing all happen offsite. Ben is only in your home to tear out the old railings and fit the new ones, all in a single day. Minimal mess, minimal disruption.
- 01
Get your online estimate
Fill out the online form for a quick estimate.
- 02
Book an in-person consultation
See and touch the samples.
- 03
Demo & measure
Ben measures the space, tears out your old railing and puts up a temporary railing so your stairs stay safe to use.
- 04
Offsite manufacturing, staining & finishing
This takes 5 to 10 business days, depending on the size of your project.
- 05
Installation
Ben removes the temporary railing and fits your new one, usually in a day, maybe two depending on the size of the project.
- 06
Enjoy your new railings
Fresh railings, and a home that stayed clean the whole way through.
Is it time
for new railings?
If any of these sound familiar, a one-day reno is worth a look.
- Unsafe or loose railings?
- Ben builds railings that are strong, stable and safe to lean on.
- Outdated look?
- Update your railing system to a clean, modern style.
- Don't meet code?
- Ben brings your railings up to the National Building Code, 2023 Alberta Edition.
One-day reno questions
What homeowners ask before they book.
How long does a one-day railing reno actually take?
The install is the part that takes a day, maybe two on a larger project. The whole job runs longer than that: Ben measures and removes your old railing first, then builds, stains and finishes the new one in his shop over about 5 to 10 business days, then comes back and fits it.
Will there be dust or fumes in my house?
No. About 70% of the work, all the drilling, cutting, staining and finishing, happens offsite in Ben's shop. Your railing arrives pre-finished, so there is no sanding and no staining going on in your home.
Are my stairs still safe to use while the new railing is being built?
Yes. Once the old railing comes out, Ben puts up a temporary railing so the stairs stay safe to use for the whole time the new one is in the shop.
How much does a one-day railing reno cost?
Railings are priced by the lineal foot based on the style and material, with options for demo and removal, staining, and premium rail, post and baluster styles. Put your measurements into the quote form and Ben will email you an estimate, or send a photo and he will price it for you.
Will the new railing meet building code?
Yes. Ben builds to the National Building Code, 2023 Alberta Edition, which sets the requirements for railing height, spindle spacing and a graspable handrail.
What happens if something goes wrong later?
Every project is backed by Ben's Lifetime Limited Warranty on his workmanship.
One day. No mess. Total transformation.
Start with a quick online estimate, or send a photo and Ben will price it for you.
